Snow Conversion "Excess Charges" - 400+ Documents.

Random samples from microfiche set created by plaintiff. The set was created on 06/24/88. (Microfiche examples of overcharges related to "A-1 to B-2 snow conversions". Microfiche Key: 65.60 = Sheet 65 of 65, frame #60.)(3900 "document frames" in the microfiche set.)

08/21/87 -

Plaintiff rejected or "Red-tagged" all LTS101 hardware, software, and services (due to "overheat" and "snow").

05/12/89 -

DOJ asks RCB to explain more ("overheat" and "snow") and send more documents.

SHEET.FRAME DESCRIPTION
36.01 - 42.41
(401 Documents)

"SNOW CONVERSION" - Cover sheet for "SNOW CONVERSION" section in the Relator's original microfiche disclosure (created on 06/24/88) describing the gas turbine engine conversion contract, which, in its proposed form, attempted to include unapproved changes within the $25,000.00 repair charge per engine. This culminated in the Relator's refusal to sign the final specification contract which misidentified (1) the unapproved changed items included in the "hot end section" and an accurate and contractually acceptable explaination for these changes ("defect" v. "improvement") and (2) the inclusion of charges to AHC which had been identified as the results of unapproved changes which were linked to allegedly "non-compliant" parts and performance. This contract and project was referred to by any of the following names:
1. "Subcontract CG-80-B-1"
2. "LTS101-750-A1 to LTS101-750-B2 Gas Turbine Engine Conversion Subcontract"
3. "A1 to B2" or "A1-B2"
4. "B-2 Contract" or
5. "SNOW CONVERSION".

36.03

"CHART" - "Unacceptable ("SNOW OVERCHARGES")" versus "Acceptable" chart created by Relator to explain the CG-80-B-1 contract contents.

36.18

AHC "A1 to B2" contract ("CG-80-B-1") acceptance.

36.19

Letter Agreement for "A1 to B2" conversion contract.

36.22

Agreement coverpage showing "SNOW = A1 to B2".

36.23

"Overcharges" itemized and identified by "part numbers", contested and refused by Relator.

36.28 - 36.29

Manufacturer's "FALSE CLAIMS" about what is approved and included by contract.

36.36

"G.P. MODULE" - changed and included without explaination or approval.

36.38

"HIPPED BLADES" - changed and included without explaination or approval.

36.39 - 36.40

Excess "SNOW" charges "MARKED" by Relator on contract document.

54.25

AHC/Childs directs Relator to "not" demand a list of "Unapproved Engineering Change Proposals" ("ECP's") for "SNOW CONVERSION" (A1 to B2) because "AHC would have to disclose all of Avco's unapproved changes to the USCG/Government".